Case studies

Engineering case studies
that speak for themselves.

Real projects. Measurable results. Across every sector we serve.

Hydraulic power unit with pumps and gearbox
04 Industrial / Reliability Retainer

HPU reliability retainer, hydraulic pump & gearbox investigation

Root cause

Hydraulic pumps and gearbox on an HPU showed accelerated wear flagged by vibration analysis. Weibull life modelling confirmed wear was system-driven, not ageing. A 2018 overhaul had set all pumps to identical pressure settings, creating vibrational resonance. Introducing a pressure differential resolved it. A design deficiency was also identified: no isolation check valves between pumps and the common discharge manifold.

Discuss a similar project
Pharmaceutical cleanroom
05 Pharmaceutical

Cleanroom engineering review

Zero

Full engineering review of GMP cleanroom systems, resolving 23 identified compliance risks. Zero compliance failures recorded across two subsequent regulatory inspections.

Discuss a similar project
Offshore support vessel
06 Marine

Vessel maintenance overhaul

40%

Overhauled the maintenance strategy for a fleet of 8 offshore support vessels. Maintenance cost reduction achieved within 24 months through RCM and spare parts rationalisation.

Discuss a similar project
Work with us

Have a project
in mind?

Tell us what you're working on. We'll give you a straight answer on how we can help.

Start the conversation